Seakeeper gyro stabilizer basics

Seakeeper · Reference for the YMH Engineer · Published 24 Jul 2026 · Updated 14 Nov 2026

Seakeeper gyros need routine service to keep the flywheel spinning safely. Cooling: closed seawater loop, requires clean strainer and functional seacock. Never operate outside sea temperature limits published for your model (typical: 35-90 degrees F seawater).

Spool-up: 30-60 minutes depending on model, do NOT engage while cold. Flywheel bearings sit inside a vacuum-tight enclosure and are not listed on Seakeeper's published scheduled-maintenance plan. Follow the current Seakeeper Scheduled Maintenance Plan and the owner's manual for your model (inspections every 1000 running hours or annually, whichever comes first; certain replacements at 2000 hours), and have starred items performed by a certified Seakeeper dealer.

Do not attempt DIY work on the flywheel or enclosure. Vacuum: the flywheel spins in a vacuum-sealed enclosure. If vacuum is lost (small leak in the enclosure), performance degrades, the display will show an alert.

Vacuum recovery is a Seakeeper service item. Cooling flow: 8-12 gpm typical for Seakeeper 6, 15-20 gpm for the 9. Insufficient flow will trigger overheat shutdown.

Anodes on the cooling loop: inspect annually. When decommissioning for winter, run a full Seakeeper winterization procedure, a frozen cooling loop cracks the internal heat exchanger, expensive repair.

Source: Seakeeper Scheduled Maintenance Plan (TB-90426-8, public)

Keep this engine's log in Yacht Masters Hub